Final | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/20/2003 at 11:33:19 AM. Contact: ###-####.
|
Final | 2/20/2003 | 2/20/2003 | 2/20/2003 | A | FAIL |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/20/2003 at 7:04:28 AM. Contact: ###-####. home owner used fernco coupling with out shield, needs to use shielded coupling on two lavs. 2/21/2003 9:07:03 AM
|
Final | 2/19/2003 | 2/19/2003 | 2/19/2003 | A | FAIL |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/19/2003 at 12:33:40 AM. Contact: ###-####. three lavs s trapped 2/21/2003 9:02:21 AM
|
Water and/or Sewer | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PASS |
Ron Ginner
|
|
|
jim; Phone #: ###-#### plumbing rough in complete, ok to drywall. 8/9/2002 1:23:13 PM
|
Plumbing Rough-in | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 08:15:36. Contact: ###-####.RECOMEND RELOCATING SHOWER HEAD LINES TO PROTECT FROM FREEZE. ALSO INSULATE BASIN WATER . ADD VALVE AT WATER HEATER. 7/29/2002 3:48:08 PM
|
Plumbing Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | PART |
Lee Rice
|
|
|
Added by Inspector: 309 On 3/29/2002 1:54:39 PM 1st floor r/i and test ok.
|
Plumbing Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | A | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 07:29:15. Contact: ###-####.
|
Other | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Lee Rice
|
|
|
applicant called and asked for permit to be extended. Permission granted.
|
PLM-Aging Inspection | 12/27/2001 | 12/27/2001 | 12/27/2001 | | NR |
Gary Ziegler
|
|
|
|
Other | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 05:40:50. Contact: ###-####.
|
Water and/or Sewer | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 00:00:53. Contact: ###-####.
|
Groundwork | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 8/13/2001 1:32:39 PM
|
Groundwork | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | NR |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 8/13/2001 10:07:36 AM
|
Other | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 8/9/2001 1:48:48 PM Scheduled by confernceInspector: 334 On 8/9/2001 1:48:48 PM 8/9/2001 3:18:11 PM
|