Final | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 12:49:37. Contact: ###-####. final ok with test caps removed from the vtr's and basement tub and laundry sink wastes capped. basement fixtures are future. 12/28/2001 9:38:19 AM
|
Plumbing Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 10:13:27. Contact: ###-####.
|
Plumbing Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 09:18:45. Contact: ###-####. nail plate water service piping in basement utility room wall, test failed on kitchen sink and utility room waste and vent systems, garage bathroom floor and walls must be constructed as a shower if it is to be ued as a shower. garage waste and vent test failed. 10/9/2001 4:13:28 PM
|
Plumbing Rough-in | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 10:50:11. Contact: ###-####. 10-5-01 JEANEE CALLED IN TO CANC INSPECTION///DLD
|
Plumbing Rough-in | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 10:50:11. Contact: ###-####. canc . by plumbing contractor 10/5/2001 2:11:33 PM
|
Groundwork | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Bill VanDegrift
|
|
|
###-####- jim another groundwork gar 9/5/2001 2:45:18 PM age gw ok 9/5/2001 2:45:25 PM
|
Groundwork | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PASS |
Bill VanDegrift
|
|
|
###-#### early am want to pour
|