Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 6/14/2002 11:47:17 AM
|
Final | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 13:13:30. Contact: ###-####. test dcva 6/13/2002 9:06:12 AM
|
Final | 6/10/2002 | 6/10/2002 | 6/10/2002 | A | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 6/10/2002 10:18:57 AM set all fixtures, mop sink not to be used as a shower, temp occ ok
|
Final | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 07:49:06. Contact: ###-####.
|
Plumbing Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 16:54:02. Contact: ###-####. ri ok with with the t&p and pan drain run 1/11/2002 11:47:27 AM
|
PLM-Aging Inspection | 12/26/2001 | 12/26/2001 | 12/26/2001 | | NR |
Bill VanDegrift
|
|
|
|
Water and/or Sewer | 10/26/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/26/2001 11:32:40 AM new water service
|
PLM-Aging Inspection | 10/11/2001 | 10/11/2001 | 10/11/2001 | | NR |
Bill VanDegrift
|
|
|
|
Groundwork | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-#### randall gw ok with risers wrapped, water service piping is maxed out and suggested increase of service while the floor is open. 8/9/2001 1:24:04 PM
|