Final | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 07:37:33. Contact: ###-####.
|
Plumbing Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 15:12:02. Contact: ###-####. water undersized in one unit, glue 1 1/2" 90 and coupling, 3" 90, n.p. and isolators 3/1/2002 12:05:05 PM
|
Plumbing Rough-in | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 3/1/2002 12:05:24 PM
|
PLM-Aging Inspection | 12/31/2001 | 12/31/2001 | 12/31/2001 | | NR |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 10/30/2001 | 10/30/2001 | 10/30/2001 | | NR |
Bill VanDegrift
|
|
|
|
Groundwork | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Bill VanDegrift
|
|
|
###-####
|