Final | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Jim Johnson
|
|
|
South west corner of building ###-#### water test ok 11/2/2001 2:33:45 PM
|
Final | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Gerry Varner
|
|
|
###-#### STEVE
|
Plumbing Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | FAIL |
Gerry Varner
|
|
|
roof drain\###-####\north east portion no test 10/18/2001 1:22:59 PM
|
Roof Drains | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PART |
Gerry Varner
|
|
|
###-#### roof drains north side ok 10/10/2001 1:39:51 PM
|
Roof Drains | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | FAIL |
Gerry Varner
|
|
|
###-#### STEVE NORTH WEST CORNER OF BLD. PLEASE CALL 30 MIN BEFORE INSPECTION AS STEVE WOULD LIKE TO BE THERE. lower to be 24" below finish grade 10/5/2001 1:01:59 PM
|
Plumbing Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PART |
Gerry Varner
|
|
|
roof drains\\###-#### Steve conference ok 9/10/2001 4:25:53 PM
|