Final | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 17:01:58. Contact: ###-####.
|
Plumbing Rough-in | 10/26/2001 | 10/29/2001 | 10/29/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 12:34:56. Contact: ###-####.
|
Plumbing Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/26/2001 1:24:35 PM ri ok
|
Plumbing Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 11:15:19. Contact: ###-####. ri ok with nail plates installed and t&p drain moved away from toilet 10/19/2001 2:28:08 PM
|
Groundwork | 9/12/2001 | 9/12/2001 | 9/12/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 9/12/2001 11:03:52 AM
|
Groundwork | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 16:59:49. Contact: ###-####. tests seem ok , provide access to approved plans 9/11/2001 9:35:30 AM
|
Groundwork | 9/11/2001 | 9/11/2001 | 9/11/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 9/11/2001 11:25:55 AM vent upper ends of garage drainage system, provide a vent in the upstream chamber of the interceptor, pipe thru roof, do not connect to s.s. venting, water service ok to cover, provide access to approved plans bld01-00445.
|