Sprinkler (Final) | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 13:00:02. Contact: ###-####. tie-in ok. okto cover, need to raise r.p. twelve inches above finish grade 9/13/2001 10:39:10 AM
|
Sprinkler (Final) | 9/17/2001 | 9/18/2001 | 3/17/2000 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 12:34:42. Contact: ###-####.
|