Final | 11/21/2001 | 11/23/2001 | 11/23/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 12:17:46. Contact: ###-####.
|
Final | 11/23/2001 | 11/23/2001 | 11/23/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 11/23/2001 8:39:47 AM
|
Final | 11/20/2001 | 11/21/2001 | 11/21/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 11/20/2001 3:32:45 PM
|
Final | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 07:22:31. Contact: ###-####.
|
Plumbing Rough-in | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PASS |
Jim Johnson
|
|
|
###-#### ROB
|