PLM-Aging Inspection | 12/13/2002 | 12/13/2002 | 12/13/2002 | | PASS |
Jim Johnson
|
|
|
|
Final | 2/5/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 2/5/2002 12:52:20 PM
|
Final | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PART |
Jim Johnson
|
|
|
3rd floor only\\###-#### may need spill-proof pressure type vacuum breaker on bed pan washer 1/14/2002 4:46:58 PM
|
Plumbing Rough-in | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PASS |
Jim Johnson
|
|
|
###-#### DARREN
|
Med/Gas Systems | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 12/7/2001 5:31:50 PM
|
Plumbing Rough-in | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PART |
Jim Johnson
|
|
|
med gas ###-#### rough test on 12/7/2001 5:33:17 PM
|
Plumbing Rough-in | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Jim Johnson
|
|
|
DARREN PAGER # ###-####
|
Plumbing Rough-in | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PART |
Jim Johnson
|
|
|
###-#### pager west half of building second floor drainage test ok 11/30/2001 2:37:25 PM
|
Plumbing Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Jim Johnson
|
|
|
###-#### PAGER DAREN drain,s ,vent,s and water on second floor north end half test ok in wall only. 11/7/2001 11:44:25 AM
|
Med/Gas Systems | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/31/2001 9:10:52 AM end of 24 hour test risers into basement ceiling 11/1/2001 8:45:14 AM
|
Med/Gas Systems | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | PART |
Bill VanDegrift
|
|
|
###-#### DAREN start of 24 hour test on risers from basement ceiling to 3rd floor, 159 psi, vac, 160 psi oxy. 10/31/2001 9:12:12 AM
|
Med/Gas Systems | 10/26/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/26/2001 11:14:28 AM 2nd floor vac inlet rough test
|
Plumbing Rough-in | 10/25/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Jim Johnson
|
|
|
###-#### DAREN 2ND FLOOR south half above floor only ok 10/29/2001 9:01:51 AM
|
Plumbing Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | PASS |
Gerry Varner
|
|
|
###-#### daren third floor ri ok 10/17/2001 10:51:31 PM
|
Plumbing Rough-in | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | PART |
Gerry Varner
|
|
|
###-#### daren
|
Med/Gas Systems | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/11/2001 1:54:34 PM end of 24 hour test west side inlets and outlets connected. 10/12/2001 11:51:12 AM
|
Med/Gas Systems | 10/10/2001 | 10/11/2001 | 10/11/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/10/2001 10:07:47 AM inlet hook up 3rd floor west side inlet hook up ok 10/11/2001 8:35:40 AM
|
Med/Gas Systems | 10/11/2001 | 10/11/2001 | 10/11/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/11/2001 8:35:07 AM east side 24 hour test start 10/11/2001 1:54:56 PM
|
Med/Gas Systems | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/9/2001 4:29:25 PM partial 24hour test ok, this is just for the o2and vac west side 2nd floor needs procedure room piping and test and risers. provide a shutoff valve in a box, in the corridor, for the 2nd floor o2 outlet. 10/10/2001 10:34:08 AM
|
Plumbing Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Bill VanDegrift
|
|
|
MED GAS INSP. SENT TO YOU FROM JERRY partial O2 and vac test started 10/9/2001 4:30:09 PM
|
Plumbing Rough-in | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | PART |
Gerry Varner
|
|
|
###-#### DAREN
|
Plumbing Rough-in | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | FAIL |
Gerry Varner
|
|
|
r/i on 3rd floor- darren ###-####
|