Med/Gas Systems | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Jim Johnson
|
|
|
( FINAL ) ? DARREN PAGER # ###-#### received med/gas testing report 12/4/2001 5:18:11 PM
|
Med/Gas Systems | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PASS |
Bill VanDegrift
|
|
|
###-#### DAREN med gas ri ok 10/30/2001 11:05:22 AM
|
Med/Gas Systems | 10/26/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/26/2001 11:15:43 AM med gas rough test still needs Nitrus line run
|
Med/Gas Systems | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | NR |
Bill VanDegrift
|
|
|
###-#### daren
|
Med/Gas Systems | 10/25/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/25/2001 9:21:46 AM test started
|
Plumbing Rough-in | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PART |
Lee Rice
|
|
|
###-#### daren plumbing ok, med gas not back in yet. 9/26/2001 3:02:50 PM
|