Sprinkler (Final) | 10/12/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 10/12/2001 10:20:15 AM
|
Sprinkler (Final) | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Jim Johnson
|
|
|
dennis-- ###-#### for backflow tie-in ok . ok to backfill contractor to recall when r.p. tested and certified 10/9/2001 1:51:08 PM
|