Final | 12/24/2001 | 12/24/2001 | 12/24/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/24/2001 at 09:16:40. Contact: ###-####.
|
Final | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:10:27. Contact: ###-####. 12/20/2001 2:29:24 AM four union 12/20/2001 2:29:37 AM remove dilectric unions from brass to copper is creating dismilar metals not isolating them four unions two on water heater two on backflow set several sinks when tops get set every thing else looks ok 12/20/2001 2:33:57 AM
|
Plumbing Rough-in | 10/23/2001 | 10/24/2001 | 10/24/2001 | P | PASS |
Stan Johnson
|
|
|
###-#### INA
|
Plumbing Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 | A | FAIL |
Stan Johnson
|
|
|
###-#### they are moving hdcp. toilet to 18" to wall will retest when finnished 10/23/2001 11:12:05 AM
|
Plumbing Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | | DONE |
|
|
|
|