Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/14/2001 at 14:23:18. Contact: ###-####.
|
Plumbing Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | NR |
Bill VanDegrift
|
|
|
###-####
|
Plumbing Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/17/2001 3:03:09 PM
|
Plumbing Rough-in | 10/15/2001 | 10/16/2001 | 10/16/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/15/2001 at 11:44:59. Contact: . move trap and water lines above door way up as far as possable, washer box vent is backgraded, roll toilet vent above flow line. 10/16/2001 4:22:39 PM
|