Final | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/20/2001 at 08:35:38. Contact: ###-####.
|
Plumbing Rough-in | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 10/23/2001 2:06:12 PM
|
Plumbing Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 08:01:21. Contact: ###-####.water ok drains failed 10/19/2001 2:41:48 PM
|
Plumbing Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | NR |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 07:43:18. Contact: ###-####.floor joist in way of tub drain 10/18/2001 1:30:48 PM
|