Sprinkler (Final) | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | PASS |
Gary Ziegler
|
|
|
###-####
|
Sprinkler (Final) | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Lee Rice
|
|
|
###-#### ###-#### called contractor on leak coming from united waters meter box and approved tie in for cover outside of box.. Notified contractor to call back when dcva was installed in box with test ports plugged. 10/19/2001 11:20:53 AM 10/19/2001 11:22:07 AM
|