Final | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 10:38:37. Contact: ###-####. passed final with no ice machine installed if a ice machine is to be installed in the future, will need to require proper permit 8/22/2002 6:47:14 PM
|
Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 15:52:51. Contact: ###-####. need thermal expansion tank, need to pipe t&p,s to floor drain , need hose bibb vacuum breaker on hydrant,s on roof need to have ice machine installed 7/30/2002 1:25:57 PM
|
Plumbing Rough-in | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 07:59:44. Contact: ###-####. restroom plumbing area rough-in test ok 4/3/2002 3:05:28 PM
|
Water and/or Sewer | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 14:10:00. Contact: ###-####. main water trunk line with branch lines,s and ball valves test ok 2/6/2002 10:59:45 AM
|
Groundwork | 2/5/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 2/5/2002 10:19:51 AM
|
Groundwork | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 09:41:01. Contact: ###-####. groundwork in restroom area air test -ok contractor to call when rest of groundwork is ready 1/30/2002 5:19:00 PM
|
Roof Drains | 1/10/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 16:05:33. Contact: ###-####. late late pm
|
Water and/or Sewer | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 10:26:51. Contact: ###-####. water line only 11/19/2001 3:07:11 PM
|
Water and/or Sewer | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 11:44:53. Contact: ###-####. air test failed 11/13/2001 12:40:03 PM
|
Water and/or Sewer | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 14:49:41. Contact: ###-####. six inch sewer line out side building air test ok 11/2/2001 2:04:35 PM
|
Groundwork | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 14:01:38. Contact: ###-####.
|