Final | 1/25/2002 | 1/28/2002 | 1/28/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/25/2002 at 14:03:37. Contact: ###-####.
SHOULD BE OPEN
|
Plumbing Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 16:24:26. Contact: ###-####.
|