Sprinkler (Final) | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Gary Ziegler
|
|
|
###-#### RYAN
|
Sprinkler (Final) | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PASS |
Gary Ziegler
|
|
|
ryan ###-#### backflow- re-insp
|
Sprinkler (Final) | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | FAIL |
Jim Johnson
|
|
|
###-#### ryan need to expose tie in for inspection need additional hose clamp,s at sprinkler tee and at R.P. connection. R.P. need,s to tested and certified 10/29/2001 2:11:59 PM
|