Information based on query as of Tuesday, July 2, 2024.
Permit Information
Permit NumberPLM01-03752
StatusExpired
Name COMFORT SYSTEMS USA INTERMOUNTAIN
Site Address 8000 S FEDERAL WAY
Project NameMICRON MASK SHOP
Customer Number 
ePlanReview 
Description
Underground subrough plumbing $172,000.00 initial cert aml
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Groundwork1/28/20021/30/20021/30/2002PPART
DetailsBill VanDegrift
###-#### ame as am 1/29/2002 2:45:25 PM
Groundwork1/28/20021/30/20021/30/2002APART
DetailsBill VanDegrift
###-#### dlb contained fire water drain to dock ok 1/29/2002 2:45:07 PM
Groundwork1/24/20021/25/20021/25/2002PCANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 01/24/2002 at 12:57:13. Contact: .
Groundwork1/23/20021/24/20021/24/2002PCANC
DetailsBill VanDegrift
###-#### RICK
Plumbing Rough-in1/16/20021/16/20021/16/2002PPART
DetailsBill VanDegrift
###-#### 6x10 iw from area by pit to dock, apx 40' test ok 1/16/2002 4:20:19 PM
Water and/or Sewer1/10/20021/14/20021/14/2002ANR
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 1/10/2002 1:59:44 PM end of 4 hour test sign inspection report i did this one friday and had entered it for today by mistake 1/14/2002 10:07:39 AM
Groundwork1/10/20021/11/20021/11/2002APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 1/10/2002 2:50:17 PM end of test ok 1/11/2002 9:03:51 AM
Groundwork1/8/20021/10/20021/10/2002PPART
DetailsBill VanDegrift
###-#### start 4 hour test, sign inspection report after micron , chemical dis rooms waste piping 1/10/2002 2:01:11 PM
Groundwork12/7/200112/10/200112/10/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 12/7/2001 11:47:55 AM signed card for fridays inspection 12/10/2001 9:32:47 AM
Groundwork12/6/200112/7/200112/7/2001APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/06/2001 at 13:01:11. Contact: . air test started will sign off monday after micron's done with their 4 hr test 12/7/2001 11:47:37 AM
Groundwork11/5/200111/5/200111/5/2001PPASS
DetailsLee Rice
rick ###-#### 3 underground (in slab) polyproplene main drains for equipment condensate from above. Noted that direct placement in concrete. Contractor said he questioned that with the engineers and they said they were comfortable with it. 11/5/2001 1:27:19 PM