Final | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 08:41:12. Contact: ###-####.
|
Plumbing Rough-in | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/09/2001 at 08:12:56. Contact: ###-####.
|
Plumbing Rough-in | 11/7/2001 | 11/8/2001 | 11/8/2001 | A | CANC |
Stan Johnson
|
|
|
|
Plumbing Rough-in | 11/8/2001 | 11/8/2001 | 11/8/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/08/2001 at 08:21:51. Contact: ###-####.drains failed again 11/8/2001 3:21:10 PM
|
Plumbing Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 07:55:56. Contact: ###-####.second time same violation drain test failed 11/7/2001 3:46:24 PM
|
Plumbing Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/06/2001 at 07:43:23. Contact: ###-####. test for drain,s waste and vent,s failed ( called left message with plumbing contractor) water system test ok 11/6/2001 3:15:31 PM
|