Final | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 08:22:38. Contact: ###-####.
|
Plumbing Rough-in | 12/3/2001 | 12/3/2001 | 12/3/2001 | A | PASS |
Lee Rice
|
|
|
|
Plumbing Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Lee Rice
|
|
|
called and asked them to look at exposed lines to carwash valve in garage. 11/14/2001 5:16:10 PM
|