Final | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 330 On 5/31/2002 10:44:00 AM
|
Plumbing Rough-in | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | PASS |
Gary Ziegler
|
|
|
|
Groundwork | 11/13/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Gary Ziegler
|
|
|
BILL ###-#### ###-####
|