Final | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PASS |
Ron Ginner
|
|
|
STEVE ###-####
|
Plumbing Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 3/12/2002 5:10:04 PM
|
Water and/or Sewer | 3/11/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Bill VanDegrift
|
|
|
###-#### STEVE PLEASE CALL 1ST this was a r/i. 3/12/2002 5:10:29 PM
|
Groundwork | 2/20/2002 | 2/21/2002 | 2/21/2002 | P | PART |
Bill VanDegrift
|
|
|
###-#### STEVE PLEASE CALL 1ST wrong this was a partial rough in waste and vent only, went over water sizing, 1" shutoff valve and a short piece of 1' MAIN TO THE BRANCH SERVING THE WATER HEATER, THEN 3/4" EVERYWHERE ELSE 2/21/2002 5:13:49 PM
|