Final | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 1/9/2002 2:09:40 PM final ok
|
Plumbing Rough-in | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 10:01:51. Contact: ###-####. this was a final 1/9/2002 2:10:02 PM
|
Plumbing Rough-in | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-#### JOE
|