Final | 4/4/2002 | 4/5/2002 | 4/5/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 15:59:33. Contact: ###-####.
|
Plumbing Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PASS |
Gary Ziegler
|
|
|
###-#### GREG
|
PLM-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | PASS |
Gary Ziegler
|
|
|
|
Groundwork | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Gary Ziegler
|
|
|
###-####
|