Sprinkler (Final) | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/30/2001 3:12:13 PM needs 160 upstream of the pvb, tie in ok expose water line from tie in to water service to pvb, replace all 80 psi utility piping with 160 min. psi service piping from tie in to pvb, line must grade by gravity back to drain valve, have valve re-certified, call for re-inspection. 12/3/2001 10:44:05 AM
|
Sprinkler (Final) | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PART |
Bill VanDegrift
|
|
|
###-#### bryan 160 psi required upstream of pvb 11/30/2001 3:11:12 PM
|