Final | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 08:29:20. Contact: ###-####.
|
Final | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 10:07:29. Contact: ###-####. caulk fixtures , repipe relief to garage, avb on hose bibb, cert backflow 10/21/2002 3:09:36 PM
|
Plumbing Rough-in | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 11:09:08. Contact: ###-####.
|
Water and/or Sewer | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 14:59:44. Contact: ###-####.
|
Plumbing Rough-in | 4/19/2002 | 4/19/2002 | 4/19/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 10:23:28. Contact: ###-####.
|
Plumbing Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 | P | FAIL |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 10:01:51. Contact: ###-####. waste test failed, needs nail plates, bath tub r/i upstairs won't work. Gary, you may want to have him call you back when shower and tubs are set also. 4/17/2002 3:24:33 PM also, I asked if water line had been ran yet? note posted on window by front door. 4/17/2002 3:28:07 PM
|
Groundwork | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 09:01:48. Contact: ###-####.
|
Groundwork | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 10:48:33. Contact: ###-####.
|
Water and/or Sewer | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 10:44:53. Contact: ###-####. sewer only 1/16/2002 2:13:51 PM
|