Final | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 1/10/2002 10:00:23 AM
|
Final | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 1/10/2002 1:32:31 PM
|
Plumbing Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 1/9/2002 10:55:25 AM
|
Plumbing Rough-in | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | NR |
Gary Ziegler
|
|
|
Joe ###-#### call first he wants to meet you there.
|