PLM-Aging Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 | | PASS |
Ron Ginner
|
|
|
job completed and inspected by stan johnson, not doc finaled 12/12/2002 8:21:00 PM
|
Water and/or Sewer | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | PASS |
Ron Ginner
|
|
|
drain in a/c tower ###-#### don
|
Water and/or Sewer | 8/28/2002 | 8/30/2002 | 8/29/2002 | A | PART |
Ron Ginner
|
|
|
###-#### sewer line under cooling tower pad must be schedule 40, site contractor to install and test pad drain and use sch 40 pipe, pad drain to sewer must be installed by plbg contractor. 8/29/2002 3:01:10 PM
|
Water and/or Sewer | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Gerry Varner
|
|
|
don; Phone #: ###-####
|
Water and/or Sewer | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PASS |
Gerry Varner
|
|
|
water line reinsp.; Phone #: ###-####
|
Water and/or Sewer | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 17:45:27. Contact: ###-####.roof drain lines on east and west side underground lines finished 1/31/2002 2:49:31 PM
|
Water and/or Sewer | 1/28/2002 | 1/29/2002 | 1/29/2002 | A | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 13:45:53. Contact: ###-####.sewer line o.k. will do water when meter is set 1/29/2002 10:46:32 AM
|
Water and/or Sewer | 1/22/2002 | 1/22/2002 | 1/22/2002 | A | CANC |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 1/22/2002 7:25:25 AM
|
Water and/or Sewer | 1/18/2002 | 1/18/2002 | 1/18/2002 | A | PART |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 1/18/2002 11:13:48 AM checked out start of project on sewer line laying with laser bedding in gravel 1/18/2002 11:18:11 AM
|
Water and/or Sewer | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | PART |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 1/18/2002 11:14:20 AM proceding ok with sewer line 1/18/2002 3:23:54 PM
|
Water and/or Sewer | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | CANC |
Stan Johnson
|
|
|
blair ###-#### swr line only
|
Groundwork | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Stan Johnson
|
|
|
Blair ###-####
|
Water and/or Sewer | 1/16/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 1/16/2002 2:15:52 AM Blair ###-#### 1/16/2002 2:18:36 AM--cancel per blair
|