Final | 9/26/2002 | 9/26/2002 | 9/26/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 07:37:23. Contact: ###-####.
|
Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 14:19:08. Contact: ###-####.
|
Plumbing Rough-in | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 09:46:52. Contact: ###-####. needs premise protection backflow 1/24/2002 1:15:23 PM
|