Information based on query as of Tuesday, July 2, 2024.
Permit Information
Permit NumberPLM02-00181
StatusFinaled
Name CLOVERDALE PLUMBING CO
Site Address 12251 W USTICK RD
Project NameTREASURE VALLEY BIBLE CHURCH
Customer Number 
ePlanReview 
Description
COMPLETE PLUMBING SYSTEM PER INITIAL CERT OF VALUE $83,316.00
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/26/20029/27/20029/27/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 09/26/2002 at 14:44:29. Contact: ###-####.
Final9/25/20029/25/20029/25/2002PPART
DetailsJim Johnson
need to install main shut off valve cap and drain lines in future kitchen area tighen cleanout plugs in future kitchen and bathroom area provide access panel for trap primer by mech room install drinking fountain contractor to recall when ready 9/25/2002 4:57:01 PM
Water and/or Sewer9/25/20029/25/20029/25/2002PCANC
DetailsJim Johnson
Phone #: ###-#### Internet Inspection Request from: Pam Masselli
Plumbing Rough-in5/15/20025/16/20025/16/2002APART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 05/15/2002 at 15:00:18. Contact: ###-####. all water main,s except kit hot and cold test under working pressure ok all drain,s waste and vent, except kit area test ok 5/16/2002 3:24:45 PM
Plumbing Rough-in5/7/20025/8/20025/8/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 05/07/2002 at 13:01:45. Contact: ###-####. main restroom,s on north side and janitor sink area rough-in and test ok 5/8/2002 12:15:53 PM
Roof Drains5/7/20025/8/20025/8/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 05/07/2002 at 13:02:30. Contact: ###-####. roof drain,s on south lower roof section water test ok 5/8/2002 12:13:00 PM
Plumbing Rough-in5/2/20025/3/20025/3/2002APART
DetailsLee Rice
Scheduled by a contractor via Hello! on 05/02/2002 at 14:18:55. Contact: ###-####. Change 2 inch san ts on drain lines from lavs to 3by 2 san ts with 3 inch clean outs. 5/3/2002 2:33:29 PM
Roof Drains5/2/20025/3/20025/3/2002APASS
DetailsLee Rice
Scheduled by a contractor via Hello! on 05/02/2002 at 14:19:28. Contact: ###-####.
Groundwork4/8/20024/9/20024/9/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 04/08/2002 at 15:14:35. Contact: .
Groundwork4/5/20024/5/20024/5/2002PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 04/05/2002 at 08:12:24. Contact: ###-####. bath-room,s for gym area test ok 4/5/2002 3:33:54 PM
Roof Drains4/4/20024/4/20024/4/2002PPASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 04/04/2002 at 08:06:40. Contact: .
Roof Drains4/1/20024/2/20024/2/2002APART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 04/01/2002 at 15:03:58. Contact:
Groundwork2/11/20022/12/20022/12/2002APART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 02/11/2002 at 14:16:32. Contact: . small groundwork in middel section of building air test -ok 2/12/2002 12:01:14 PM
Groundwork2/6/20022/7/20022/7/2002PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 02/06/2002 at 15:54:52. Contact: water line in to building ok need vent on outlet sid of grease intercepter trunk lines stub in to west side of building with stub up,s ok. 2/7/2002 6:06:08 PM
Groundwork1/30/20021/30/20021/30/2002PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 01/30/2002 at 08:23:05. Contact: . east end groundwork done air test ok 1/30/2002 4:32:40 PM
Groundwork1/24/20021/24/20021/24/2002PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 01/24/2002 at 10:39:58. Contact: ###-####. east end sewer trunk line air test -ok 1/24/2002 4:20:54 PM