Final | 9/26/2002 | 9/27/2002 | 9/27/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 14:44:29. Contact: ###-####.
|
Final | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PART |
Jim Johnson
|
|
|
need to install main shut off valve cap and drain lines in future kitchen area tighen cleanout plugs in future kitchen and bathroom area provide access panel for trap primer by mech room install drinking fountain contractor to recall when ready 9/25/2002 4:57:01 PM
|
Water and/or Sewer | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | CANC |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Pam Masselli
|
Plumbing Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 15:00:18. Contact: ###-####. all water main,s except kit hot and cold test under working pressure ok all drain,s waste and vent, except kit area test ok 5/16/2002 3:24:45 PM
|
Plumbing Rough-in | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 13:01:45. Contact: ###-####. main restroom,s on north side and janitor sink area rough-in and test ok 5/8/2002 12:15:53 PM
|
Roof Drains | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 13:02:30. Contact: ###-####. roof drain,s on south lower roof section water test ok 5/8/2002 12:13:00 PM
|
Plumbing Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 14:18:55. Contact: ###-####. Change 2 inch san ts on drain lines from lavs to 3by 2 san ts with 3 inch clean outs. 5/3/2002 2:33:29 PM
|
Roof Drains | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 14:19:28. Contact: ###-####.
|
Groundwork | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 15:14:35. Contact: .
|
Groundwork | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 08:12:24. Contact: ###-####. bath-room,s for gym area test ok 4/5/2002 3:33:54 PM
|
Roof Drains | 4/4/2002 | 4/4/2002 | 4/4/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 08:06:40. Contact: .
|
Roof Drains | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 15:03:58. Contact:
|
Groundwork | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 14:16:32. Contact: . small groundwork in middel section of building air test -ok 2/12/2002 12:01:14 PM
|
Groundwork | 2/6/2002 | 2/7/2002 | 2/7/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 15:54:52. Contact: water line in to building ok need vent on outlet sid of grease intercepter trunk lines stub in to west side of building with stub up,s ok. 2/7/2002 6:06:08 PM
|
Groundwork | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 08:23:05. Contact: . east end groundwork done air test ok 1/30/2002 4:32:40 PM
|
Groundwork | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 10:39:58. Contact: ###-####. east end sewer trunk line air test -ok 1/24/2002 4:20:54 PM
|