Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 07:54:05. Contact: ###-####.
|
Plumbing Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PASS |
Stan Johnson
|
|
|
###-####
|
Plumbing Rough-in | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | FAIL |
Stan Johnson
|
|
|
###-#### TIMtest failed on drains level washer box install Y for softner drain to washer box 1/24/2002 2:56:02 PM
|