Permit Information
Permit NumberPLM02-00210
StatusFinaled
Name TECH PLUMBING
Site Address 8363 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReview 
Description
demo of old plumbing under and above slab waste under and above slab water air piping condesate, install 6 water closets. 4 lavs 2 urinals 1 mop sink 1 drinking fountain 1 break sink 6 floor drains, 5 water heaters, 2 hose bibs 1 wall sink includes sump pit and pump sewer lift station and pumps sewer vaults per initial cert of value $59970.00//final value $79,133000 09/13/02
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/4/20026/5/20026/5/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 06/04/2002 at 15:31:39. Contact: ###-####.
Final5/8/20025/8/20025/8/2002PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 05/08/2002 at 10:45:06. Contact: ###-####. premis protection need,s certified expose floor drain in shop area provide bolt,s for sump lid,s check flush valves in restroom,s may need adjustments called plumbing contractor 5/8/2002 3:08:16 PM
Final4/17/20024/17/20024/17/2002APART
DetailsJim Johnson
Scheduled by Inspector: 360 On 4/17/2002 1:15:12 PM restroom,s brakeroom sink and mopsink only oked temp 4/17/2002 1:22:52 PM
Plumbing Rough-in4/16/20024/17/20024/17/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 04/16/2002 at 14:11:58. Contact: ###-####.
Groundwork3/28/20023/29/20023/29/2002APASS
DetailsJim Johnson
Scheduled by a contractor via Hello! on 03/28/2002 at 16:12:09. Contact: ###-####.
Plumbing Rough-in3/27/20023/27/20023/27/2002PPART
DetailsJim Johnson
###-#### ALAN sump tank test ok 3/28/2002 9:15:53 AM
Plumbing Rough-in3/20/20023/21/20023/21/2002APART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 03/20/2002 at 12:29:13. Contact: ###-####. new water line and over head water line test ok 3/21/2002 12:50:12 PM
Groundwork3/15/20023/18/20023/18/2002APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 03/15/2002 at 11:56:21. Contact: ###-####. partial gw ok interceptor needs testing, piping to and from ok, needs vents installed 3/18/2002 11:34:19 AM
Groundwork3/14/20023/15/20023/15/2002PCANC
DetailsJim Johnson
Scheduled by a contractor via Hello! on 03/14/2002 at 15:56:52. Contact: ###-####. canc by plumbing contractor 3/15/2002 12:47:35 PM
Plumbing Rough-in3/4/20023/4/20023/4/2002PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 03/04/2002 at 08:49:42. Contact: ###-####. rest room rough in ok 3/4/2002 4:54:59 PM
Other2/12/20022/12/20022/12/2002 PASS
DetailsLee Rice
Jim, I approved interceptor resubmittal, its in your mailbox. Now, get out their and inspect.
Groundwork2/5/20022/6/20022/6/2002APART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 02/05/2002 at 15:55:24. Contact: ###-####. bathroom group and trunk line to front of building air test ok still need to finish sewer line to sewer ejector and intercepter 2/6/2002 4:48:53 PM