Final | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 18:28:02. Contact: ###-####.
|
Plumbing Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 07:43:21. Contact: ###-####.
|
Plumbing Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 07:48:16. Contact: ###-####. drain,s waste and vent,s test failed. water system test ok. left correction notice on job site 2/1/2002 3:13:47 PM
|
Plumbing Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | NR |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 07:45:36. Contact: ###-####.
|