Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 09:37:39. Contact: ###-####.
|
Plumbing Rough-in | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 16:01:17. Contact: . ri ok still needs a pump for the water heater in the basement 2/6/2002 8:31:05 AM
|
Plumbing Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### washer box branch fitting is in backwards, provide a sump in the basement for water heater t&p drain and water heater leakage, cap off all existing waste openings in the basement. 2/1/2002 4:02:15 PM
|