Final | 12/27/2002 | 12/27/2002 | 12/27/2002 | A | PASS |
Bill VanDegrift
|
|
|
this was for the permit update for equipment hook up, final ok
|
Final | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
Plumbing Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 6/19/2002 4:17:20 PM concentrated metals and high temp iw test ok
|
Plumbing Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 5/15/2002 4:15:04 PM
|
Groundwork | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 08:17:39. Contact: ###-####. one rd upper level east side, test on the outer 8x10 fire water drain to south dock 3/22/2002 2:42:17 PM
|
Groundwork | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 09:24:57. Contact: ###-####. 2 rd's south west upper level stub outs, irrigation stub out donestic water stubout, sch 80 pvc gravity drain from compressor pad to basement , tests ok 3/15/2002 3:38:30 PM
|
Groundwork | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 3/8/2002 3:30:04 PM north branch retest ok 3/11/2002 12:11:58 PM
|
Groundwork | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 11:45:36. Contact: ###-####. start 4 hr test on dlb cont. in the electrical area 3/8/2002 11:44:58 AM
|
Groundwork | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 3/8/2002 11:45:15 AM part gw center dlb cont branch, southern branch was damaged by laborer, north outer ok inner down a pound will reinspect monday 3/8/2002 3:32:20 PM
|
Groundwork | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 09:13:30. Contact: ###-####. 9x10 from sump to loading dock test ok. 3/4/2002 3:07:53 PM
|
Groundwork | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 09:43:48. Contact: ###-####. test on the repaired containment piping from the chem rooms to the sump 2/28/2002 5:52:07 PM
|
Groundwork | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:46:11. Contact: ###-####. test on 4" contained from basement to f.s. on ground floor north side 2/26/2002 5:02:44 PM
|
Groundwork | 2/22/2002 | 2/25/2002 | 2/25/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/22/2002 at 16:41:05. Contact: ###-####. misc. dwv at grade north side 2/25/2002 3:08:55 PM
|
Groundwork | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 15:58:21. Contact: ###-####. 3 rd stubs north main level and a 4" sewer extention east to west center into ceiling of di room... also retest failed on dlb cont from chem storage rooms, interior pipoing shattered 48" from south end, repair pending 2/22/2002 11:35:14 AM
|