Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 14:37:34. Contact: ###-####.
|
Plumbing Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Stan Johnson
|
|
|
###-####
|
Plumbing Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 | A | FAIL |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 2/21/2002 10:35:06 AM run waterlines to lav and w.c. through floor instead of outside wall to prevent freezing 2/21/2002 10:47:43 AM
|
Plumbing Rough-in | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | PASS |
Stan Johnson
|
|
|
r/i ###-#### --jake
|