Final | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 08:45:47. Contact: ###-####. final ok with master lav replaced 5/2/2002 2:39:15 PM
|
Plumbing Rough-in | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 09:08:10. Contact: ###-####.
|