Water and/or Sewer | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 3/12/2002 10:20:15 AM
|
Final | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 16:59:19. Contact: ###-####. need to support building drain every four feet as per U.P.C table 3-2 3/6/2002 10:46:46 AM
|
Water and/or Sewer | 3/1/2002 | 3/4/2002 | 3/4/2002 | A | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 17:01:44. Contact: ###-####.will hookup mh later 3/4/2002 9:26:42 AM
|