Water and/or Sewer | 3/5/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 3/5/2002 10:31:53 AM tank seem ok to me 3/5/2002 10:44:19 AM
|
Water and/or Sewer | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 2/28/2002 5:57:35 PM part ok the abs/pvc joint is ok and the drain in the equipment shed is nonexistant, will call for reinspection when the interceptor is complete 3/1/2002 10:45:02 AM
|
Water and/or Sewer | 2/27/2002 | 2/28/2002 | 2/28/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 20:16:31. Contact: ###-####. use the approved interceptor, install venting, install compressor room drainage, use approved transition at abs/pvc joint in sewer, 2/28/2002 5:56:34 PM
|
Water and/or Sewer | 2/27/2002 | 2/28/2002 | 2/27/2002 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 20:12:35. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/27/2002 at 20:14:13.
|