Final | 6/7/2002 | 6/7/2002 | 6/7/2002 | A | PASS |
Gary Ziegler
|
|
|
|
Final | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 09:56:57. Contact: ###-####. ACCESS DST ON LOCK BOX IN BACK
|
Plumbing Rough-in | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 09:35:05. Contact: ###-####.
|