DOC - Permit Finaled | | | 11/25/2002 | | DONE |
|
|
|
|
Other | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 6/19/2002 2:48:02 PM conference on hot water recirc. line to upstream of rp ok
|
Final | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 15:17:11. Contact: ###-####.
|
Plumbing Rough-in | 3/26/2002 | 3/26/2002 | 3/26/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 3/26/2002 10:32:40 AM made walk through with Bill T. with United Water AND Bruce with De Best plumbing . Need to isolate crime labatory with approved R. P. on hot and cold water systems and to pipe emergency eye wash and shower seperate ahead of R.P. delivered correction notice to De Best office. 3/26/2002 11:15:02 AM
|
Plumbing Rough-in | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 11:55:59. Contact: ###-####. plumbing rough-in on water and waste drain,s and vent test ok ( note crime laboratorie may require additional service backflow protection) 3/22/2002 4:45:04 PM
|
Groundwork | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 11:23:43. Contact: ###-####. test existing drain,s to neutralizer. provide letter for enfield fitting,s to be used under ground 3/11/2002 6:56:05 PM
|