Final | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 08:59:45. Contact: ###-####. no sprinkler permit no final 5/3/2002 3:20:06 PM
|
Final | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 10:33:39. Contact: ###-####. set dishwasher, install building sewer c.o.cover 4/26/2002 2:09:19 PM
|
Plumbing Rough-in | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 08:14:33. Contact: ###-####.
|