Final | 7/19/2002 | 7/19/2002 | 7/19/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/19/2002 at 06:59:00. Contact: ###-####. final ok with urinal and drinking fountain as future fixtures. must comply with ada standards when installed. 7/19/2002 11:16:53 AM
|
Final | 7/17/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 07:08:18. Contact: ###-####. needs a dcva on the fountain make up water inside the front door 7/17/2002 1:54:21 PM
|
Final | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Bill VanDegrift
|
|
|
fn rob ###-#### they have a useable restroom temp occ ok 7/2/2002 1:41:18 PM
|
Plumbing Rough-in | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | PART |
Bill VanDegrift
|
|
|
rob- ###-#### ok to cover walls but still needs to correct the vent Jim caught them on 4/18/2002 2:33:57 PM
|
Plumbing Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PART |
Jim Johnson
|
|
|
mate ###-#### r/i ok to cover wall,s only for 3 sink,s and one mop sink need to change inch and half vent to two inch or revent fixtures contractor exceeded one -third permitted horizontal length as per table 7-5 upc 4/1/2002 3:55:33 PM
|
Groundwork | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Bill VanDegrift
|
|
|
###-####- mate gw ok 3/14/2002 1:46:00 PM
|
Plumbing Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### ROB floor sink/ hub drain must be exposed in cabinet toe kick, new branch line is installed backwards. 3/12/2002 2:04:49 PM
|