Final | 6/3/2002 | 6/3/2002 | 6/3/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 07:06:15. Contact: ###-####.
|
Final | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | PART |
Jim Johnson
|
|
|
###-#### MAIT need more time to finish will recall when ready 5/31/2002 5:03:17 PM
|
Final | 5/28/2002 | 5/28/2002 | 5/28/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 07:20:14. Contact: ###-####. provide spill-proof P.V.B. for coffee maker,s provide strainer,s and approved grates for floor sinks seal floor sink under bar cabnit and pipe drains around to exposed floor sink finish hooking up bar equipment provid indirect drains for ice bin drains provide cleanout plug and strainer for floor drain in water heater room 5/29/2002 1:53:22 PM
|
Final | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PART |
Jim Johnson
|
|
|
mait- ###-#### fn may require additional cross control protection 5/8/2002 5:52:16 PM
|
Plumbing Rough-in | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 3/19/2002 2:11:07 PM
|