Final | 4/18/2002 | 4/19/2002 | 4/19/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 4/18/2002 2:12:37 PM
|
Final | 4/17/2002 | 4/18/2002 | 4/18/2002 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 19:54:23. Contact: ###-####. needs a drain under the r.p. at washer 4/18/2002 2:12:13 PM
|
Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 17:40:36. Contact: ###-####. needs an avb upstream of the control valve on the mold grinder, Bill Thompson is going to show up to make a determination on the solvent washer this afternoon and let me know what will be required. 4/17/2002 9:27:45 AM
|
Final | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PART |
Gary Ziegler
|
|
|
###-#### ###-#### waiting for dental equipment to be set gz 4/8/2002 11:08:22 AM
|
Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | NR |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 4/5/2002 12:36:16 PM
|