Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 16:43:23. Contact: ###-####. final ok with future lav waste perminatly capped 7/11/2002 9:32:00 AM
|
Plumbing Rough-in | 5/20/2002 | 5/21/2002 | 5/21/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 12:34:40. Contact: ###-####.
|
Groundwork | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 4/8/2002 2:00:47 PM
|
Plumbing Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | NR |
Gary Ziegler
|
|
|
###-#### RENEE
|