PLM-Aging Inspection | 12/30/2002 | 12/30/2002 | 12/30/2002 | | PASS |
Jim Johnson
|
|
|
|
Water and/or Sewer | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 5/9/2002 4:24:12 PM ( note) masco determined building supply with musgrove engineering building supply ok for building fixture load 5/9/2002 4:35:48 PM
|
Water and/or Sewer | 4/29/2002 | 5/1/2002 | 5/1/2002 | A | PART |
Jim Johnson
|
|
|
###-#### TROY sewer test ok need to see approved plan,s to determine water sizing for building supply 5/1/2002 12:32:32 PM
|
Water and/or Sewer | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | PART |
Jim Johnson
|
|
|
###-#### TROY lower end of sewer tied in need to test lower end of sewer tie in 4/26/2002 3:32:34 PM
|
Water and/or Sewer | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Jim Johnson
|
|
|
###-#### need to tie in lower end of sewer and retest contractor to call when ready ok to cover upper end of sewer,s 4/22/2002 5:08:36 PM
|