Final | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 16:53:14. Contact: ###-####.
|
Final | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 20:31:58. Contact: ###-####. test dcva, max 24" water h 5/16/2002 10:11:39 AM ater flex, temp occ ok 5/16/2002 10:11:50 AM
|
Plumbing Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 16:10:44. Contact: ###-####. r/i/ok 5/1/2002 1:55:14 PM
|