Final | 1/8/2003 | 1/8/2003 | 1/8/2003 | P | PASS |
Gary Ziegler
|
|
|
this was a doc. final that should not have been
|
Plumbing Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | PASS |
Gary Ziegler
|
|
|
###-#### says this has not been roughed in and final should have been called on plm02-01186
|
Final | 10/1/2002 | 10/1/2002 | 10/1/2002 | P | PASS |
Gary Ziegler
|
|
|
###-####
|
Water and/or Sewer | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | PASS |
Gary Ziegler
|
|
|
WATER ONLY JOHN ###-####
|
Groundwork | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 5/14/2002 1:13:46 PM
|
Water and/or Sewer | 5/13/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Gary Ziegler
|
|
|
greg ###-####
|